Saturday, 26 September 2015

Thursday, 17 September 2015

HMPGM

The next evolution of Smart Bomb, able to access specific rooms through air conditioning ducts and the like.

Sunday, 13 September 2015

Greebling Practice - stage 5


First attempt at landing gear - simple telescopic design.  Unfortunately, it looked to flimsy for the size of the ship, so was ditched.




2nd try - a sturdier-looking double-folding design, with twin shock-absorbers.

Sunday, 6 September 2015

Greebling practice - stage 4





The upper surface is more-or-less fully panelled, so starting work on the underside.

Also, I've substituted an occlusion pass for the wireframe, as the wireframe was getting so dense it was hiding details

Saturday, 5 September 2015

Greebling practice - stage 3



Detailed the gun turrets, and added yet more panels

Thursday, 3 September 2015

Greebing practice - stage 2



I've tweaked the turret design, and added all the greebles from the concept painting.  Next - the other side of the ship